With around 250 locations and 90 serve centers, we are represented in the most important economic regions of the world. The advantages are clear: short paths to our customers, fast response times and a shared language.
Barrier fluid system pressurized by a bladder accumulator supplying clean liquid for an arrangement 3 pressurized dual seal.
A  Cooler
B  Bladder accumulator
C  Drain
D  Vent
4  Flush (F)
5  Liquid barrier OUT (LBO)
6  Liquid barrier IN (LBI)
7  Seal chamber
Example seal: EagleBurgmann H75A4-T dual pusher mechanical seal.
Key
1  Make-up barrier liquid
2  Bladder accumulator
3  Bladder charge connection
8  Vent
9  Barrier fluid drain
10  Valve* (for checking accumulator bladder integrity)
PI  Pressure indicator*
PIT  Pressure transmitter with local indicator
TI  Temperature indicator**
TIT  Temperature transmitter local indicator
* If specified, both the PI and valve 10 shall be installed for checking bladder integrity.
** If specified.
*** Vertically oriented, finned air cooler shall be installed if specified
3CW-FB, 3CW-BB, 3CW-FF
Follow the direct link to your API 682 4th ed. contact
Download the free EagleBurgmann API piping plan tool and benefit from useful and practical information
With our free e-mail newsletter „Excellence in Practice“, you will receive first-hand information about current products, services, references and worthwhile industry insights.